Skip to content
Tel AvivNewsletterHebrewעברית
SDE DOV

The beach and outdoors

Two kilometres of promenade, about 300 moorings, and a southern edge being rewritten at once.

Updated

The waterfront is the reason the district exists in the shape it does. Two kilometres of promenade run from Reading in the south to Tel Baruch in the north, with about 300 marina moorings planned at the northern end and beach cafés along the Central frontage.

The southern edge is the most complicated stretch in the plan: Reading power station, the fuel tanks, the marina basin and the park are all being rewritten at the same time. That is worth knowing before assuming any particular view or access route is settled.

What the plan fixes

Waterfront units

Areas appear only where a per-unit figure has been published. A complex-wide gross is not a unit area.

  • The beach promenadePlanned
    Two kilometres of beachfront from Reading to Tel Baruch
    Uses
    beach cafés · sport · marina
    Area
    not published
    Opening
    2030–2035

More in the district

Practical