Skip to content
Sde Dov
SDE DOV
The beach and shoreline at Sde Dov

Walk · Sit · Swim

Parks & Open Space

Opens ~202951 lots244 dunam
Photograph: The beach today, already open

Parks, urban squares and the seafront: the largest single land use in the plan.

Measured by area, open space is the biggest thing in this plan: more ground than housing, commerce or employment. Parks, urban squares and the seafront together are what turn an airfield into a place people walk through rather than past.

The two-kilometre promenade is the spine of it, running the length of the district from Reading power station in the south to Tel Baruch in the north.

2 km of waterfrontPromenade from Reading to Tel Baruch
Open year-roundPublic ground, not seasonal concession
The largest useMore ground than any other single class

What is on this ground

Parks & open space
Lots
51
Total plot area
244 dunam
Largest lot
81 dunam
View all

What the plan fixes

On the record

The full record

Where this ground is

The full district map

51 lots, 244 dunam of plot area. Select a parcel on the map or a lot below; they are the same list. Numbers come from plan TA/4444 and are not land-registry gush/helka numbers.

Loading the district…
Map keyKey

Lot boundaries digitised from plan TA/4444. Plan lot numbers are not land-registry gush/helka numbers. See reading a lot number. Basemap © OpenStreetMap contributors © CARTO.

Every lot on this ground

  • Lot 380Block 689681 dunam
  • Lot 380Block 690013 dunam
  • Lot 381Block 689612 dunam
  • Lot 382Block 68960.8 dunam
  • Lot 383Block 68961.4 dunam
  • Lot 384Block 68967.7 dunam
  • Lot 385Block 68967.5 dunam
  • Lot 386Block 68966.6 dunam
  • Lot 670Block 68964.6 dunam
  • Lot 671Block 68960.6 dunam
  • Lot 672Block 68961.9 dunam
  • Lot 673Block 68964.6 dunam
  • Lot 674Block 68961.3 dunam
  • Lot 675Block 68961.5 dunam
  • Lot 676Block 68962.9 dunam
  • Lot 677Block 68960.9 dunam
  • Lot 678Block 68961.0 dunam
  • Lot 679Block 68964.3 dunam
  • Lot 680Block 68961.9 dunam
  • Lot 681Block 68961.8 dunam
  • Lot 682Block 68960.7 dunam
  • Lot 683Block 68962.0 dunam
  • Lot 684Block 68961.4 dunam
  • Lot 780Block 68960.2 dunam
  • Lot 782Block 68960.5 dunam
  • Lot 783Block 68961.0 dunam
  • Lot 784Block 68961.9 dunam
  • Lot 2000Block 69000.2 dunam
  • Lot 2001Block 69009.1 dunam
  • Lot 2004Block 69005.1 dunam
  • Lot 2005Block 68840.4 dunam
  • Lot 2005Block 68962.6 dunam
  • Lot 2005Block 69003 m²
  • Lot 2006Block 69002.1 dunam
  • Lot 2262Block 69003.9 dunam
  • Lot 2700Block 69005.3 dunam
  • Lot 2701Block 68960.8 dunam
  • Lot 2702Block 68852.2 dunam
  • Lot 2702Block 68961.7 dunam
  • Lot 2703Block 688515 m²
  • Lot 2703Block 68961.8 dunam
  • Lot 2704Block 68960.2 dunam
  • Lot 2704Block 69000.9 dunam
  • Lot 2705Block 69000.8 dunam
  • Lot 2706Block 69000.7 dunam
  • Lot 2707Block 69004.3 dunam
  • Lot 2708Block 69005.1 dunam
  • Lot 2709Block 69007.9 dunam
  • Lot 2710Block 68852.1 dunam
  • Lot 2710Block 68965.4 dunam
  • Lot 3609Block 690016 dunam

Practical information

How to get here

  • WalkFrom the promenade along the waterfront
  • BikeContinuous cycle route the length of the district
  • Light railGreen Line stations serve the district
  • DriveNamir Road and the Ibn Gvirol extension
Plan your route

Good to know

  • Open during constructionThe Tel Baruch beach and promenade stay usable while the district is built.
  • Squares are not parksUrban squares are hard-landscaped civic space, often fronted by commerce.

When it opens

  1. 2024–2028Infrastructure and first buildings
  2. 2029First residents; earliest ground-floor units
  3. 2031–2035Promenade, hotels, then the northern street

No trading hours exist yet; nothing in the district has opened.

What opens on this ground

Reading

Practical

Register interest

Leave an email and we will come back to you. Nothing goes further than us.

By registering you agree to be contacted about Sde Dov. Unsubscribe at any time.

A little more, so the reply is worth reading

Your email is saved. Everything below is optional.

Close this at any point and your sign-up still stands.