Skip to content
Tel AvivNewsletterHebrewעברית
SDE DOV
The Sde Dov coastline from the air

Stay · Sea · Views

The Hotel Lots

Opens ~20298 lots20 dunam
Photograph: The coast, 2026 — no hotel is built yet

Ground the plan reserves for hospitality, most of it within sight of the water.

A district planned for about 16,000 homes is also planned for about 3,000 hotel rooms. That is not an amenity bolted onto a housing scheme — it is a separate use class with its own lots and its own tender calendar, and the plan draws it on the map.

These are the lots zoned for hotel accommodation. No operator has been published for any of them, so this page names ground, not brands.

Near the waterHotel ground sits toward the coastal edge
Hotel use classZoned specifically for מלונאות — hotel accommodation
Not yet builtNo operator has been published for any lot
Every lot below

What is on this ground

Hotel
Lots
8
Total plot area
20 dunam
Largest lot
4.0 dunam
View all

What the plan fixes

On the record

The full record

Where this ground is

The full district map

8 lots, 20 dunam of plot area. Select a parcel on the map or a lot below — they are the same list. Numbers come from plan TA/4444 and are not land-registry gush/helka numbers.

Loading the district…
Map keyKey

Lot boundaries digitised from plan TA/4444. Plan lot numbers are not land-registry gush/helka numbers — see reading a lot number. Basemap © OpenStreetMap contributors © CARTO.

Every lot on this ground

Practical information

How to get here

  • WalkFrom the promenade along the waterfront
  • BikeContinuous cycle route the length of the district
  • Light railGreen Line stations serve the district
  • DriveNamir Road and the Ibn Gvirol extension
Plan your route

Good to know

  • Rooms are not lotsThe 3,000-room figure is district-wide across sixteen lots; it is not a per-lot count.
  • Tender precedes operatorLand goes to a developer first. The hotel brand is a later, separate deal.
  • Beachfront is a subsetEight of the sixteen hotel lots are on the beachfront; the rest are inland.

When it opens

  1. 2024–2028Infrastructure and first buildings
  2. 2029First residents; earliest ground-floor units
  3. 2031–2035Promenade, hotels, then the northern street

No trading hours exist yet — nothing in the district has opened.

What opens on this ground

Practical