Walking in the shade in Sde Dov: where colonnades and shaded passages are planned

The Eshkol plan sets colonnade frontages around the central park and on the streets linking to Ibn Gabirol Street, but there are as yet no open streets on site. The first colonnades are expected at around 2029.

Updated

Streets and buildings · 7 min read · Published 2026-11-02
A freehand watercolour of an urban street with a colonnade: a row of columns supports an upper storey that projects over a shaded pavement, and on the side of the street there is a building under construction and a crane.
Illustration: An illustration, not a photograph of the district.

Where are colonnades planned in Sde Dov, and what has already been set down on record?

Walking in the shade in Sde Dov currently rests mainly on a planning layer, not on an existing situation on site. The Eshkol neighbourhood plan (TAMAL/3001) sets colonnade frontages on the main streets surrounding the central park and on the streets linking to Ibn Gabirol Street, and according to the district's website the first colonnades are expected to open at around 2029.

The Eshkol plan is the most detailed statutory plan that currently exists regarding shading in the district. It applies to an area of 340.685 dunams and permits 4,844 housing units at an average density of 54 units per net residential dunam. Within this framework, the plan's explanatory notes designate a colonnade frontage for the main streets around the central park and for the streets that link Eshkol to Ibn Gabirol Street.

According to information published on the district's website, the first colonnades are expected to open in the area of lots 101, 103 and 111 in Eshkol, together with the first occupancy in the complex, at around 2029. It is important to note that this is an expected date presented as a general estimate, not an approved date for the execution of a particular colonnade section.

Is it already possible to walk in the shade inside Sde Dov today?

No. No street in Sde Dov is currently open as part of a finished urban network, and the entire district, including Eshkol, where construction is most advanced, is an active worksite. Anyone arriving on site today encounters cranes and infrastructure works, not shaded pavements or finished covered passages.

The available documentation shows cranes on lots 101, 103 and 111 in Eshkol as of January 2026, and connection works on Einstein Street documented in June 2025. These are infrastructure and street works, not shading elements. The distinction matters: an approved plan is one layer, and the actual stage of execution is an entirely different layer, and in Sde Dov the second stage has not yet begun for any colonnade.

For those who want to follow what is happening on site at a given moment, the autumn 2026 construction log gathers the progress complex by complex. And for those who also ask about the condition of the land itself during construction, a separate article on soil contamination in Sde Dov details what is known and what has not yet been published.

Please note: there is currently no continuous, open walking route inside Sde Dov. Any description of "walking in the shade" at this stage refers to planning, not to a situation that can be experienced today.

What is a colonnade in Sde Dov, and why does its continuity matter?

A colonnade in Sde Dov is part of the building itself, not a separate addition such as an awning or a pergola. The storey above projects forward over the pavement line, and the passage created beneath it rests on a row of columns. This difference determines everything that follows: a colonnade is a permanent structural element, dependent on the construction of the building above it, not a portable element that can be added separately.

The greater practical significance is continuity. A colonnade that is continuous from block to block creates a covered street along an entire section, one where pedestrians can walk in unbroken shade from beginning to end. By contrast, a colonnade that stops at every lot boundary creates a fragmented sequence, in which the pedestrian leaves the shade and returns to it every few dozen metres, depending on where construction has actually been completed and where it has not.

A colonnade that stops at a lot boundary is not equivalent to continuous walking in the shade.

This is a point that is not always clear at first glance at a plan drawing. A plan can set a colonnade frontage along the whole length of a street, but if actual construction proceeds on different lots at different paces, the continuity experienced on site may differ from the continuity set down on paper, at least until construction on an entire section is complete.

Which streets in Eshkol include a colonnade frontage, around the central park and Ibn Gabirol?

The available statutory source defines the colonnade frontages by the functional category of a street, not by a specific street name or number. The two types of streets for which a colonnade frontage is set in the explanatory notes to the Eshkol plan are the main streets surrounding the central park and the streets linking Eshkol to Ibn Gabirol Street. On the more internal streets the emphasis is on wide pavements and tree planting, not on a statutory requirement for a colonnade frontage.

It is important to note a limitation in the record: the available material does not specify exact street names or lot numbers for each colonnade section, but describes the functional categories. Anyone who wants to understand the geographic boundaries of Eshkol relative to the rest of the district can read about Sde Dov, Eshkol and the Big Bloc in order to place these streets in relation to the rest of the district.

Street category: Main streets around the central park; What is set regarding shading: Colonnade frontage; Source: Eshkol plan, TAMAL/3001

Street category: Streets linking to Ibn Gabirol Street; What is set regarding shading: Colonnade frontage; Source: Eshkol plan, TAMAL/3001

Street category: Internal streets and residential streets; What is set regarding shading: Wide pavements and trees, with no colonnade frontage set; Source: Explanatory notes to the Eshkol plan

Street category: Pedestrian and cycle paths in the overall network; What is set regarding shading: Integrated within a full network of passages between the residential lots; Source: Explanatory notes to the Eshkol plan

Central and northern Sde Dov: what has already been approved in the design plans, and what is still open?

For the design plans of the Central and Northern complexes there is currently no complete public mapping of colonnade frontages, beyond what was set in the Eshkol plan. This is a gap in the record that must be stated explicitly: the available material does not make it possible to determine whether specific lots in the Central and Northern complexes include a continuous colonnade frontage, another shading solution, or whether the question has not yet been decided at all at the planning stage.

What is known is that the process of approving design plans for individual lots continues. In the Central complex a design plan was approved for lot 2208, and in the Northern complex a plan is advancing for lot 2226, comprising 437 housing units. For Eshkol itself, design plans were also approved for the first two hotel lots. These are one-off approvals for an individual lot, not a comprehensive document that specifies shading for the whole street network in the complex.

This difference matters to anyone trying to understand the pace of progress: Eshkol is the only complex that has both a detailed neighbourhood plan with provisions on colonnades and works on the ground. In the Central and Northern complexes the process is at the stage of planning approvals for individual lots, and until a document parallel to the Eshkol plan is published, their shading map cannot be determined.

For those who want a more up-to-date picture of the pace in the different complexes, Sde Dov in 2027 elaborates on the gap between Eshkol, Central and Northern.

Tip: when checking a specific lot in the Central or Northern complex, it is worth checking whether a separate design plan has been approved for it, and not assuming that it is subject to the same shading provisions that apply to Eshkol.

Shade trees versus a built colonnade: what is the practical difference when walking in summer?

The explanatory notes to the Eshkol plan emphasise two parallel shading measures: trees along the street, and a colonnade as part of the built frontage. Each has entirely different practical characteristics for someone walking down the street in summer.

The biggest practical difference is timing. A new tree does not provide meaningful shade in the first years after planting, even if it was planted exactly according to the plan. A colonnade, by contrast, provides immediate shade as soon as the storey above it is erected, but it depends entirely on the building above it being built first. In the interim stage, before the trees have matured and before the colonnades have been completed along an entire section, shading on the street may be partial and fragmented, even on streets where the plan sets both types of shading in parallel.

Characteristic: What determines its existence; Shade trees: Municipal planting and maintenance; Built colonnade: Building permit and execution of the building itself

Characteristic: Availability of shade; Shade trees: Depends on the tree's growth over the years; Built colonnade: Exists as soon as the storey above is erected

Characteristic: Dependence on neighbouring construction; Shade trees: Less dependent on the construction pace of a specific lot; Built colonnade: Directly dependent on completion of the building above it

Characteristic: Continuity; Shade trees: Can be planted along an entire street at once; Built colonnade: Depends on continuity between lots, and may stop at a lot boundary

Characteristic: Adaptation to conditions; Shade trees: The explanatory notes mention adaptation to expected shading and to the wind regime; Built colonnade: A permanent element that does not change with the wind

How does walking in the shade in Sde Dov connect to the promenade and Yarkon Park?

The planned shaded-walking network is not limited to the internal streets of Eshkol. The planned coastal promenade in the district extends for about two kilometres, from the Reading power station to Tel Baruch beach, and includes a connection to the district's public transport network. This is the main axis that is meant to link the different complexes along the coastline, separate from the internal street network in which the colonnade frontages were set.

Another connection that is planned but does not yet exist in practice is the bridge meant to link Eshkol to Yarkon Park. At present the bridge is under construction and cannot be crossed. This means that even if shaded walking sections inside Eshkol are ready in the relatively near term, the physical connection to Yarkon Park, which is a significantly larger green space than Eshkol's own central park, still depends on separate execution that has no verified date.

Those who want to understand this bridge in depth, including who it is intended for and what the delay in its execution means, can read the full details on the bridge to Yarkon Park. The context matters: walking in the shade in Sde Dov does not end at the boundary of the internal streets, it is part of a wider network that connects the district to the coast and the park, and these two sections are at entirely different stages of progress.

When will the first covered passages in Sde Dov actually open?

There is currently no official, verified date for the execution of a specific colonnade section or for tree planting on a particular street. The available information allows only a rough yardstick to be built, based on the expected occupancy dates of the complexes, and not on any commitment to carry out shading.

2024 to 2028: an infrastructure stage and first buildings, mainly in Eshkol. At this stage there are as yet no finished shaded pavements or active colonnades.

Around 2029: first occupancy expected in Eshkol, in parallel with the first colonnades around lots 101, 103 and 111. This is the earliest date mentioned in the available sources for actual walking in the shade in the district.

Around 2031: first occupancy expected in the Central complex. There is currently no complete public information on the scope or timing of shading execution in this complex, beyond design planning approvals for individual lots.

Around 2032: first occupancy expected in the Northern complex, where the timing of shading execution also depends on the execution of specific buildings that are still at the planning stage.

Around 2035: completion of overall construction in the district, according to a general estimate that is not a binding date for a particular building or street.

All these dates are preliminary occupancy estimates for the complex, not approved execution dates for a colonnade or an individual tree. As the additional design plans for Central and Northern are published and approved, it will be possible to update the picture more precisely, but as of the writing of these lines, November 2026, the only date anchored in an available source is the expectation of the first colonnades in Eshkol at around 2029.

Frequently asked questions

What is a colonnade, and how does it differ from a pergola or an ordinary awning?

A colonnade is a permanent structural part of the building itself, not a separate addition such as a pergola or an awning. The storey above projects forward over the pavement line and rests on a row of columns, so that the shaded passage depends on the execution of the building above it and not on an element that can be added separately. In Sde Dov, the explanatory notes to the Eshkol plan designate a colonnade frontage for the main streets around the central park.

How long does it take a new tree to provide meaningful shade on a street?

A new tree does not provide meaningful shade in the first years after planting, even if it was planted exactly according to the plan. In Sde Dov, the explanatory notes to the Eshkol plan set tree planting on the internal streets alongside colonnade frontages on the main streets, but in the interim stage, before the trees mature, shading on the street may remain partial and fragmented even after the surrounding buildings are occupied.

Has a colonnade frontage already been set in the Central and Northern complexes of Sde Dov?

No, there is currently no complete public mapping of colonnade frontages in the Central and Northern complexes, beyond what was set in the Eshkol plan. In both of these complexes the process is at the stage of design planning approvals for individual lots, such as lot 2208 in Central and lot 2226, comprising 437 housing units, in Northern, and not at the stage of a comprehensive neighbourhood document that specifies shading for the whole street network as exists in Eshkol.

How long is the planned coastal promenade in Sde Dov, and where does it lead?

The planned coastal promenade in the district extends for about two kilometres, from the Reading power station to Tel Baruch beach. It is planned as a main walking axis along the coastline, separate from the internal street network of Eshkol in which the colonnade frontages were set, and according to the available information it includes a connection to the district's public transport network. The promenade does not yet exist as an open, continuous route on site.

Can the planned bridge between Eshkol and Yarkon Park already be crossed?

No, the bridge is currently under construction and cannot be crossed. It is meant in future to link the Eshkol complex to Yarkon Park, a significantly larger green space than Eshkol's own central park, but it has no verified completion date. Even if shaded walking sections inside Eshkol are completed in the relatively near term, the physical connection to the park remains dependent on separate execution.

How many housing units does the Eshkol plan permit, and what is its density?

The Eshkol plan, TAMAL/3001, permits 4,844 housing units on an area of about 340.685 dunams, at an average density of 54 housing units per net residential dunam. It is the most detailed statutory plan that currently exists for the Sde Dov district, and within the same framework it also sets the colonnade frontages on the main streets around the central park and on the connection to Ibn Gabirol Street.

More from the blog

The record

Register interest

Leave an email and we will come back to you. Nothing goes further than us.

By registering you agree to be contacted about Sde Dov. Unsubscribe at any time.

A little more, so the reply is worth reading

Your email is saved. Everything below is optional.

Close this at any point and your sign-up still stands.